Still putzing away at getting my house finished. A lot of details lie between nearly finished and . . . finished enough to live in. Although it's been a while since I posted any pictures, I'm flat out amazed at what a pita it is to post pics. No wonder I seldom post any. Hats off to those of you who do. It takes me all of my lunch hour.
Remember my scaffolding to paint the gable on the basement side? Not OSHA approved.
Here's the front of the house, pretty much finished except for a driveway and planter in front of the porch.
Got the porch and deck railings finished. This is the deck on the east side of the house.
Here's the master bath tile work before the shower glass.
And here's the shower glass with the fish sandblasted on it.
The master bath granite counter and sinks. No mirrors yet; gotta' get those.
The fireplace is surrounded with slate. The cubby hole on the left will be a wood bin on the lower part, and the A/V system will go above. Wires to speakers in the ceiling and out on the deck are visible in the photo.
And these oak stairs leading to the basement I built this past winter.
Still have a few odds and ends, but mainly need to add the tile backsplash to the kitchen counters before we move in.
Sg